|
Week of |
No. Weeks |
Lab Title |
Downloads |
Point Value |
|
January 14 |
1 |
Introduction to oscilloscope, function generator, digital multi-meter (DMM), and curve fitting. |
--- |
|
|
January 21 |
1 |
Transients in RLC circuits (no lecture - MLK Holiday) |
50 |
|
|
January 28 |
1 |
Frequency domain analysis of linear circuits using synchronous detection
RLC lab report should be submitted electronically not later than midnight of your Lab day. Notebooks should be submitted in the beginning of the Lab section |
|
100 |
|
February 4 |
1 |
Pulses in transmission lines
Frequency analysis lab report should be submitted electronically not later than midnight of your Lab day. Notebooks should be submitted in the beginning of the Lab section |
100 |
|
|
February 11 |
1 of 2 |
Millikan Oil Drop Experiment / Week 1
Transmission lines lab report should be submitted electronically not later than midnight of your Lab day. Notebooks should be submitted in the beginning of the Lab section |
Millikan1 (right-click to download project file) |
--- |
|
February 18 |
2 of 2 |
Millikan Oil Drop Experiment / Week 2
|
100 |
|
|
February 25 |
1 of 2 |
Torsion Oscillator / Week 1
Millikan oil drop lab report should be submitted electronically not later than midnight of your Lab day. Notebooks should be submitted in the beginning of the Lab section |
--- |
|
|
March 4 |
2 of 2 |
Torsion Oscillator / Week 2 |
100 |
|
|
March 11 |
1 |
Hall Probe Measurement of Magnetic Fields
Torsion oscillator lab report should be submitted electronically not later than midnight of your Lab day. Notebooks should be submitted in the beginning of the Lab section |
100 |
|
| March 18 | Spring Break - No Labs | |||
|
March 25 |
1 of 2 |
Qualitative Studies with Microwaves / Week 1
Hall probe lab report should be submitted electronically not later than midnight of your Lab day. Notebooks should be submitted in the beginning of the Lab section |
--- |
|
|
April 1 |
2 of 2 |
Microwave Cavities / Week 2 |
150 |
|
|
April 8 |
1 of 3 |
Final Project – AC Measurement of Magnetic Susceptibility / Week 1
Microwave lab report should be submitted electronically not later than midnight of your Lab day. Notebooks should be submitted in the beginning of the Lab section |
--- |
|
|
April 15 |
2 of 3 |
Final Project – AC Measurement of Magnetic Susceptibility / Week 2 |
|
|
|
April 22 |
3 of 3 |
Final Project – AC Measurement of Magnetic Susceptibility / Week 3. |
300 |
|
|
April 29 |
Final week: Final Project Reports due on May 7th at 11.59 PM. Reports should be submitted by uploading. |
|
Total
1000 |